No independently verified direct evidence is registered. The closest direct-relevance observations are company disclosures of a reported 1% Gemini-training-time reduction and an internal AI-research demonstration; neither is independently audited.
Is AI accelerating the creation of better AI?
Public evidence shows task-specific AI assistance inside AI development and credible adjacent evidence about software work, but it does not establish a reproducible, independently audited multiplier for frontier AI R&D or autonomous successor creation.
Editorial synthesis · no canonical measurement No single score is shown because the evidence measures different things.
METR's randomized study of experienced open-source developers found a 19% slowdown with early-2025 tools. Its later experiment contained serious selection and measurement problems, so it neither cleanly reverses nor settles the earlier result.
There is no public longitudinal study that randomly varies frontier-agent access inside frontier AI R&D, measures quality-adjusted research output and model improvement, and separates human direction, compute, and agent contribution.
Public evidence reaches parts of steps 1–2. It does not yet establish steps 3–4.
Explore observations, forecasts, and expert beliefsOpen evidence lanes
2026-06-04Anthropic's internal AI-development operational reportSupports limited contribution
Anthropic reports that, as of May 2026, Claude authored more than 80% of code merged into its codebase and that the typical engineer merged eight times as much code per day in Q2 2026 as in 2024. It also reports a March poll of 130 research-team employees with a median estimate of roughly 4x output with Mythos Preview.
When AI builds itself · Anthropic ↗2026-06-04Anthropic's constrained autonomous AI-safety research demonstrationSupports limited contribution
Anthropic reports that Claude-powered agents, given an open AI-safety research problem with a pre-specified floor and ceiling, recovered 97% of the measured gap over 800 cumulative agent-hours; two human researchers recovered about 23% over roughly a week. Anthropic says the agents proposed hypotheses, ran experiments, shared findings, and iterated.
When AI builds itself · Anthropic ↗2026-05-11Technical workers' self-reported value and speed changesSelf-report signal
METR surveyed 349 technical workers, including 71 researchers. Participants reported median AI-related changes in work value of 1.4x to 2x and a median speed change of 3x around March 2026.
Measuring the Self-Reported Impact of Early-2026 AI on Technical Worker Productivity · METR ↗2026-02-24Later METR developer-productivity experiment becomes hard to interpretMixed
METR's later raw estimates suggested an 18% speedup for returning participants and a 4% speedup for newly recruited participants, but METR judged selection into the study and time measurement during concurrent agent use severe enough that the experiment was only very weak evidence about the current effect.
We are Changing our Developer Productivity Experiment Design · METR ↗2025-07-10Randomized study of early-2025 AI tools for experienced open-source developersCounterevidence
In a randomized study of 16 experienced developers working on 246 issues in repositories they knew well, METR found that allowing early-2025 AI tools made issue completion 19% slower (reported confidence interval: 2% to 39% slower).
Measuring the Impact of Early-2025 AI on Experienced Open-Source Developer Productivity · METR ↗2025-05-14AlphaEvolve deployment in Gemini training optimizationSupports limited contribution
Google DeepMind reports that AlphaEvolve found a matrix-multiplication-kernel change that improved that kernel by 23% and reduced Gemini training time by 1%; it also reports reducing kernel-optimization work from weeks of expert effort to days of automated experiments.
AlphaEvolve: A Gemini-powered coding agent for designing advanced algorithms · Google DeepMind ↗2024-11-22RE-Bench: agent performance on ML research-engineering tasksCapability signal
METR evaluated agents on seven ML research-engineering tasks with 71 human-expert attempts. With an eight-hour budget, it reported Claude 3.5 Sonnet and o1-preview at roughly the 37th and 30th percentiles of the human attempts, respectively.
Evaluating frontier AI R&D capabilities of language model agents against human experts · METR ↗- Dec 2025 timelines update · model · directSuperhuman Coder2031-12
- AI 2027 · scenario · proxy1.5x AI R&D progress multiplier2026-06
- Internal-goals statement (livestream + X post) · intention · contextautomated AI research intern, then true automated AI researcher2026-09 / 2028-03
- Compute-centric takeoff-speeds framework · model · proxy20%-to-100% cognitive automation in 3 years (model median)conditional — clock starts at 20% automation
Shared milestone ladderOpen date comparison
The forecast page compares dated milestones; the evidence page keeps each source, status, and counterargument auditable.
Compare AI R&D milestones →Could near-total AI R&D produce a 10× feedback loop within five years?
299 responses to this question, within 2,778 respondents to the October 2023 ESPAI. This is a dated judgment about a stronger scenario—not a current consensus or a measured probability of takeoff.
Exact wording and method
Some people have argued the following: If AI systems do nearly all research and development, improvements in AI will accelerate the pace of technological progress, including further progress in AI. Over a short period (less than 5 years), this feedback loop could cause technological progress to become more than an order of magnitude faster. How likely do you find this argument to be broadly correct?
Direct response-category shares among the 299 randomized-subset responses; no mean, median, or pooled forecast was calculated.
Original survey results ↗Six drivers. One reality line for each.
Every measurement begins with the plain-language takeaway and current observation. The charts put published predictions on the same axis as what actually happened.
Browse the six core measurementsOpen measurements
Latest recorded observation2025-08 · last published point; 90% CI 1.078e26-2.659e26Epoch AI trends — Training Runs ↗
checked 2026-07-27 · Epoch refits as models are added
Explore chart and 2 forecastsOpen evidence
How much compute is used to train frontier language models?
Epoch top-five frontier trend estimate · Training FLOP · Source: Epoch AI trends — Training Runs ↗
How to read this chart
Log scale. Rate forecasts are plotted as the level they imply at their target date, compounded from this metric's own series.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| Reality | 2020-01 | 4.47e+22 · 90% CI 2.73e22-7.50e22 | Source-linked observation | Epoch AI trends — Training Runs ↗ |
| Reality | 2020-10 | 1.32e+23 · 90% CI 8.90e22-2.01e23 | Source-linked observation | Epoch AI trends — Training Runs ↗ |
| Reality | 2021-09 | 4.83e+23 · 90% CI 3.59e23-6.59e23 | Source-linked observation | Epoch AI trends — Training Runs ↗ |
| Reality | 2022-06 | 1.64e+24 · 90% CI 1.30e24-2.08e24 | Source-linked observation | Epoch AI trends — Training Runs ↗ |
| Reality | 2023-03 | 4.71e+24 · 90% CI 3.79e24-5.91e24 | Source-linked observation | Epoch AI trends — Training Runs ↗ |
| Reality | 2023-12 | 1.395e+25 · 90% CI 1.083e25-1.821e25 | Source-linked observation | Epoch AI trends — Training Runs ↗ |
| Reality | 2024-08 | 3.89e+25 · 90% CI 2.82e25-5.45e25 | Source-linked observation | Epoch AI trends — Training Runs ↗ |
| Reality | 2025-08 | 1.677e+26 · last published point; 90% CI 1.078e26-2.659e26 | Source-linked observation | Epoch AI trends — Training Runs ↗ |
| Leopold | 2027-12 | ~0.5 OOM/yr frontier training-compute growth sustained | ahead · medium assessment confidence | Published claim ↗ |
| Epoch | 2027-09 | ~5x/yr training-compute growth sustained | pending · low assessment confidence | Published claim ↗ |
Leopoldaheadmedium confidence
“training compute used for frontier AI systems has grown at roughly ~0.5 OOMs/year”Ch I, From GPT-4 to AGI
- Prediction
- ~0.5 OOM/yr frontier training-compute growth sustained
- By
- 2027-12
Conditionality: firm — stated as the historical baseline he extrapolates through 2027. NOTE: his separate '+2 OOMs of compute (a cluster in the $10s of billions)... by the end of 2027' is a CLUSTER size/cost claim, not a single-run FLOP claim; conflating them would misstate him. Scored here only as the sustained growth-rate extrapolation (implies ~2e27-scale runs by end-2027 from GPT-4's 2e25).
Evidence · 2026-07Measured against the frontier trend rather than the record run, reality runs faster than his baseline: Epoch's top-5 series grows 0.7 OOM/yr (90% CI 0.6-0.8) against his stated ~0.5, rising 3.89e25 to 1.677e26 in the year to Aug 2025 (about 4.3x). Extrapolated to end-2027 that clears the ~2e27 his +2 OOM implies.Canonical measurement source 1 ↗
CounterargumentScored 'ahead' on Epoch's fitted trend, whose published data stops at Aug 2025 — the last 11 months are unmeasured. Epoch itself expects the pace to break within 1-2 years of Sept 2025 on training-duration and lead-time limits, which would pull this back to his rate or below.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- ~0.5 OOM/yr frontier training-compute growth sustained · 2027-12
1 recorded assessment
- 2026-07aheadmedium confidence
Epochpendinglow confidence
“Frontier AI labs may still scale training compute at 5x per year for another 1-2 years by allocating a larger fraction of compute to training.”Compute scaling will slow down due to increasing lead times (Sep 2025), https://epoch.ai/gradient-updates/compute-scaling-will-slow-down-due-to-increasing-lead-times
- Prediction
- ~5x/yr training-compute growth sustained
- By
- 2027-09
Conditionality: hedged near-term trajectory ('may still') inside an analysis whose headline is a coming SLOWDOWN — the same piece moves the trillion-dollar-cluster date from ~2030 to ~2035 on lead-time grounds.
Evidence · 2026-08Correction: Epoch's published top-5 series ends in Aug 2025, before this Sep 2025 continuation claim. It provides context for the starting level, but no post-publication observation yet tests whether the claimed 5x/year continuation occurred.Canonical measurement source 1 ↗
CounterargumentThe pre-publication trend is relevant background and is close to the claimed rate; it may become supporting evidence once the source publishes a post-publication observation, but it cannot make a prospective claim on-track by itself.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Do not assign an on-track, ahead, or behind status until the recorded series contains an observation after the Sep 2025 publication date.
- Target / deadline
- ~5x/yr training-compute growth sustained · 2027-09
2 recorded assessments
- 2026-07on-trackmedium confidence
- 2026-08pendinglow confidence
2 supporting signals
Largest known single training run ↗
Record frozen since Jul 2025 — but newer models lack estimates
How large is the biggest known AI training run?
Epoch notable-model estimates · Total training FLOP · Source: Epoch AI notable models / trends ↗
How to read this chart
Log scale.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| Reality | 2023-03 | 2e+25 · GPT-4 | Source-linked observation | Epoch AI notable models / trends ↗ |
| Reality | 2023-12 | 5e+25 · Gemini 1.0 Ultra | Source-linked observation | Epoch AI notable models / trends ↗ |
| Reality | 2025-02 | 3e+26 · Grok 3 — first model over 1e26 (GPT-4.5 same month, 6.4e25) | Source-linked observation | Epoch AI notable models / trends ↗ |
| Reality | 2025-07 | 5e+26 · Grok 4 (~246M H100-hours, ~$500M compute cost) | Source-linked observation | Epoch AI notable models / trends ↗ |
| Reality | 2026-07 | 5e+26 · record stands; newest frontier models lack Epoch estimates (right-censored) | Source-linked observation | Epoch AI notable models / trends ↗ |
| Epoch | 2030 | 2e29 FLOP training run possible | on-track · medium assessment confidence | Published claim ↗ |
| AI 2027 | 2025-12 | 1e27 FLOP training run | indeterminate · low assessment confidence | Published claim ↗ |
| AI 2027 | 2027-03 | 2e28 FLOP training run | behind · high assessment confidence | Published claim ↗ |
Latest recorded observation2026-07 · record stands; newest frontier models lack Epoch estimates (right-censored)Epoch AI notable models / trends ↗
checked 2026-07-24 · rolling
Epochon-trackmedium confidence
“Training runs of around 2e29 FLOP are likely possible by 2030”Can AI scaling continue through 2030? (Aug 2024), https://epoch.ai/blog/can-ai-scaling-continue-through-2030
- Prediction
- 2e29 FLOP training run possible
- By
- 2030
Conditionality: feasibility claim, not a prediction — 'likely possible' if the ~4x/yr trend continues. Their constraint hierarchy: power binds first, then chip manufacturing, then data. Score against feasibility, not occurrence.
Evidence · 2026-07Reaching 2e29 from Grok 4's 5e26 requires ~3.9x/yr through 2030 — right at Epoch's measured 4-5x/yr historical trend. Multi-GW campus construction (Colossus 2, Stargate-class sites) remains consistent with their power-first constraint analysis.Canonical measurement source 1 ↗
CounterargumentThe realized record has been flat for 12 months and GPT-5 used less pretraining compute than GPT-4.5 — labs are choosing not to scale single runs even where feasible. Epoch's own Sep 2025 lead-times analysis pushes megascale milestones out ~5 years. A feasibility claim can stay technically true while becoming irrelevant to what the frontier actually does.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- 2e29 FLOP training run possible · 2030
1 recorded assessment
- 2026-07on-trackmedium confidence
AI 2027indeterminatelow confidence
“Agent-0 training compute: 10^27 FLOP (Late 2025); Agent-1: 4x10^27 FLOP”Compute forecast supplement, https://ai-2027.com/research/compute-forecast. CANONICAL READING: the compute-forecast table figures — the supplement's body text and chart give conflicting Agent-0/Agent-1 values (documented source-internal conflict, resolved per schema rule 4).
- Prediction
- 1e27 FLOP training run
- By
- 2025-12
Conditionality: scenario narrative — authors' own hedge: '2027 was our modal (most likely) year at the time of publication, our medians were somewhat longer'; the scenario is 'not a prediction'. Superseded (not overwritten) by the Dec 2025 AI Futures Model revision, which moved milestone medians ~4-5 years later.
Evidence · 2026-08Correction: the Dec 2025 deadline has passed, but public training-compute estimates are right-censored for newer frontier models and the reported gap is within the measurement uncertainty. The public record therefore cannot establish whether a 1e27 FLOP run occurred in the stated window.Canonical measurement source 1 ↗
CounterargumentNo confirmed 1e27 FLOP run has appeared more than six months after the deadline, so the public evidence leans against the milestone even though it cannot resolve it.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Use indeterminate after the deadline when newer runs are not publicly observable and the available estimate cannot distinguish a miss from an undisclosed success.
- Target / deadline
- 1e27 FLOP training run · 2025-12
2 recorded assessments
- 2026-07behindhigh confidence
- 2026-08indeterminatelow confidence
AI 2027behindhigh confidence
“Agent-2 trained with 2e28 FLOP ('1000x GPT-4'), Apr 2026 - Mar 2027”Compute forecast supplement training table, https://ai-2027.com/research/compute-forecast
- Prediction
- 2e28 FLOP training run
- By
- 2027-03
Conditionality: scenario narrative, same hedges and Dec 2025 supersession as Agent-0 claim. Note: the Phase-2 planning doc for this project quoted this as '1e28 by mid-27' — the primary source says 2e28; primary source wins.
Evidence · 2026-07Requires a 40x jump from the current 5e26 record within ~8 months, against a record that has been flat for 12 months and a demonstrated pretraining pullback (GPT-5 below GPT-4.5). The authors' own Dec 2025 revision effectively concedes this timeline ('Things seem to be going somewhat slower than the AI 2027 scenario' — Kokotajlo).Canonical measurement source 1 ↗
CounterargumentGlobal compute stock kept growing ~3.3-3.4x/yr (Epoch) even while single-run size stalled — if a lab reallocates stock into one giant run (the mechanics of Epoch's 'Manhattan Project' scenario), a 1e28-scale run in 2027 is not physically implausible, just commercially unmotivated so far.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- 2e28 FLOP training run · 2027-03
1 recorded assessment
- 2026-07behindhigh confidence
DavidsonContext only · not status-assessed
“My median AGI training requirements (~1e36 FLOP using 2020 algorithms) are high compared to some.”What a Compute-Centric Framework Says About Takeoff Speeds, Monte Carlo with aggressive training requirements — verified against the canonical Coefficient Giving page on 2026-08-17
- Prediction
- ~1e36 effective FLOP (2020-algorithms) to train AGI
- By
- undated threshold
Conditionality: model parameter, not a dated forecast — an undated threshold in effective (2020-algorithm-equivalent) FLOP, so raw training FLOP alone cannot resolve it; the report presents wide uncertainty and separately tests an aggressive ~1e31 median.
Evidence · 2026-08Correction: this is an undated model parameter, not a falsifiable forecast. The raw-to-effective FLOP conversion and broad uncertainty band make the distance from the frontier useful context, but not a status-bearing comparison.Canonical measurement source 1 ↗
CounterargumentThe parameter remains relevant to a compute-centric model of takeoff, and future work could turn a clearly dated, operationalized version into a scoreable claim.
Why this is context only
- Relationship to measurement
- This undated model parameter is retained as contextual distance from the measured frontier, not as a scoreable forecast.
- Test
- Retain as a labelled contextual model parameter. Exclude it from comparable-claim totals and forecast-status judgments.
- Target / deadline
- ~1e36 effective FLOP (2020-algorithms) to train AGI · undated threshold
2 recorded context notes
- 2026-07Context note
- 2026-08Context note
Metric notes ⓘ
Measurement notes ⓘ
Epoch reconstructions, not lab disclosures. The Grok 4 estimate rests on vague public xAI statements (Epoch: 'significant uncertainty around our point estimate'). Right-censored: Grok 4.5 (Jul 2026), Gemini 3, and GPT-5.5-class models have no published estimates yet, so the record may lag reality by months. 'Largest known' = largest Epoch-estimated.
Global AI compute stock ↗
Compounding on the bulls’ schedule while the record run sleeps
How much AI computing capacity is installed worldwide?
Epoch estimate · Millions of H100-equivalent accelerators · Source: Epoch AI chip sales / data insights ↗
How to read this chart
Log scale.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| Reality | 2023-12 | 0.65 · ~650k H100s shipped cumulatively (H100-specific, pre-H100e normalization) | Source-linked observation | Epoch AI chip sales / data insights ↗ |
| Reality | 2024-07 | 3 · ~3M H100e cumulative sold, inferred from ~$90B accelerator revenue (Epoch) | Source-linked observation | Epoch AI chip sales / data insights ↗ |
| Reality | 2026-01 | 15 · >15M H100e installed (Epoch chip-production insight, data as of Jan 8 2026) | Source-linked observation | Epoch AI chip sales / data insights ↗ |
| AI 2027 | 2027-12 | 100M H100e global stock (2.25x/yr) | on-track · medium assessment confidence | Published claim ↗ |
Latest recorded observation2026-01 · >15M H100e installed (Epoch chip-production insight, data as of Jan 8 2026)Epoch AI chip sales / data insights ↗
checked 2026-07-24 · rolling (Epoch chip-sales explorer, updated ~weekly)
AI 2027on-trackmedium confidence
“We expect the total stock of AI-relevant compute in the world will grow 2.25x per year over the next three years, from 10M H100e today to 100M H100e by the end of 2027.”Compute forecast supplement, https://ai-2027.com/research/compute-forecast — verified verbatim ('today' = Mar 2025)
- Prediction
- 100M H100e global stock (2.25x/yr)
- By
- 2027-12
Conditionality: firm trajectory forecast (their least scenario-dependent number); production table gives checkpoints Dec 2025 = 18M, Dec 2026 = 40M.
Evidence · 2026-07Their implied mid-2026 checkpoint is ~28M H100e; extrapolating Epoch's Jan 2026 hard anchor (>15M) at Epoch's own 3.3-3.4x/yr gives ~27-28M for Jul 2026 — tracking almost exactly. Their Dec 2025 checkpoint (18M) also brackets Epoch's end-2025 figures (~16M deployed / ~20M sold).Canonical measurement source 1 ↗
CounterargumentThe mid-2026 'reality' figure is an extrapolation from a six-month-old anchor, not a measurement; and supply-side constraints (HBM4 validation issues, CoWoS capacity tight through at least H1 2027) could bend the trajectory's back half below 2.25x/yr.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- 100M H100e global stock (2.25x/yr) · 2027-12
1 recorded assessment
- 2026-07on-trackmedium confidence
Epochon-trackmedium confidence
“About 100M H100-equivalents could, in principle, be dedicated to training [by 2030] — range 20 million to 400 million H100-equivalents, corresponding to 1e29 to 5e30 FLOP.”Can AI scaling continue through 2030? (Aug 2024), https://epoch.ai/blog/can-ai-scaling-continue-through-2030
- Prediction
- 100M H100e dedicatable to training
- By
- 2030
Conditionality: feasibility claim ('could, in principle') — the fleet existing is one half; DEDICATING it to a single training run is the binding half.
Evidence · 2026-07Global stock >15M H100e (Jan 2026) compounding at 3.3-3.4x/yr reaches 100M TOTAL around 2027-28 — the fleet will exist years ahead of their 2030 feasibility date on current trend.Canonical measurement source 1 ↗
CounterargumentThe allocation half is moving the wrong way for this claim: training's share of compute use is falling (AI 2027's own model has the leading company's training share going 40% to 20%; Epoch's separate finding is that frontier labs don't use most AI compute at all), so a large fleet does not imply a large dedicated training fleet.
How this status was assessed
- Relationship to measurement
- Training-dedicated fleet capacity is assessed using total installed compute stock; the allocation share remains uncertain.
- Test
- Use the named metric only as directional evidence; do not treat it as a like-for-like test.
- Target / deadline
- 100M H100e dedicatable to training · 2030
1 recorded assessment
- 2026-07on-trackmedium confidence
Leopoldon-trackmedium confidence
“Even by 2027... GPU fleets in the 10s of millions... 10 million+ A100-equivalents [training].”Ch II, From AGI to Superintelligence
- Prediction
- fleets in the 10s of millions of GPUs; 10M+ A100e on training
- By
- 2027
Conditionality: conditional-scenario; note the unit — A100-equivalents, roughly 3x smaller than H100e — and the 'training' qualifier on the 10M+ figure.
Evidence · 2026-07Global stock >15M H100e (Jan 2026) is roughly ~45M A100-equivalents — the fleet half of the claim is effectively already true a year early. The 10M+ A100e ON TRAINING half turns on allocation: ~30% of ~45M A100e would clear it, which is within plausible training shares.Canonical measurement source 1 ↗
CounterargumentThe A100e-vs-H100e conversion (~3x) does heavy lifting, and no one publishes the training-dedicated share — scoring the training half 'resolved' would rest on an allocation assumption, not a measurement.
How this status was assessed
- Relationship to measurement
- Total compute stock directly informs fleet scale, but the share allocated to training is inferred.
- Test
- Use the named metric only as directional evidence; do not treat it as a like-for-like test.
- Target / deadline
- fleets in the 10s of millions of GPUs; 10M+ A100e on training · 2027
1 recorded assessment
- 2026-07on-trackmedium confidence
Metric notes ⓘ
Measurement notes ⓘ
Stock (installed) vs flow (annual shipments) vs revenue (dollars) get conflated constantly — this series is cumulative installed capacity, H100e = TPP-normalized across Nvidia/TPU/AMD/Huawei. Epoch states the growth trend as 3.4x/yr (trends dashboard) and 3.3x/yr (chip-production insight) — same trend, two restatements. Concentration: five hyperscalers held 71% of capacity in Q4 2025; Google alone ~25% (mostly TPUs). The mid-2026 value is EXTRAPOLATED from the Jan 2026 hard anchor, not measured — Epoch's live explorer renders client-side and needs a browser pull to confirm. Sanity proxy: NVIDIA DC revenue $75.2B in Q1 FY2027 (+92% YoY), consistent with continued compounding but ASP-inflated.
Metric notes ⓘ
Measurement notes ⓘ
Top-5 by training compute, language models only — narrower than Epoch's site-wide 'frontier' definition (top 10 at time of release). Epoch reports the rate is stable across N=5/10/15 with no statistically significant difference. Headline: 5x/year since 2020 (90% CI 4-6x), doubling every 5.2 months, 0.7 OOM/year; the top-5 trend has grown ~10,000x since 2020. IMPORTANT FRESHNESS CAVEAT: the data bundle behind Epoch's chart ends at 2025-08-06 even though the page banner reads Feb 2026, so the newest point here is ~11 months old — a publication lag, not the censoring problem that afflicts the record-run series. Epoch's own view is that this pace holds ~1-2 years from Sept 2025 before training-duration ceilings (~9 months) and datacenter lead times bite. Methodology detail sits in a private Colab and could not be verified.
Latest recorded observation2024-03 · Epoch Ho et al. — language models, 8-month halving (95% CI 5-14); still the last formal estimateEpoch AI, Algorithmic Progress in Language Models (NeurIPS 2024) ↗
checked 2026-07-24 · episodic
Explore chart and 3 forecastsOpen evidence
How quickly is pretraining becoming more compute-efficient?
Epoch fixed-capability estimate · Months for required compute to halve · Source: Epoch AI, Algorithmic Progress in Language Models (NeurIPS 2024) ↗
How to read this chart
1 of 2 claims are plotted here. The other 1 set no numeric target on this axis (dated milestones, or a quantity this axis does not measure) — they are recorded in the claims below. Horizontal lines are standing rate claims — they assert a level that holds over time rather than by a target date.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| Reality | 2020-05 | 16 · OpenAI Hernandez & Brown — vision (ImageNet), 16-month doubling, 2012-2019 | Source-linked observation | Epoch AI, Algorithmic Progress in Language Models (NeurIPS 2024) ↗ |
| Reality | 2022-12 | 9 · Epoch Erdil & Besiroglu — vision, 9-month halving (95% CI 4-25) | Source-linked observation | Epoch AI, Algorithmic Progress in Language Models (NeurIPS 2024) ↗ |
| Reality | 2024-03 | 8 · Epoch Ho et al. — language models, 8-month halving (95% CI 5-14); still the last formal estimate | Source-linked observation | Epoch AI, Algorithmic Progress in Language Models (NeurIPS 2024) ↗ |
| Leopold | 2027-12 | ~2 OOM algorithmic efficiency vs GPT-4 (range 1-3) | on-track · medium assessment confidence | Published claim ↗ |
| Forethought | ongoing | ~3x/yr training-efficiency gain continues (halving ~7.6 months) | on-track · medium assessment confidence | Published claim ↗ |
Leopoldon-trackmedium confidence
“1-3 OOMs of algorithmic efficiency gains (compared to GPT-4) by the end of 2027, maybe with a best guess of ~2 OOMs.”Ch I, From GPT-4 to AGI
- Prediction
- ~2 OOM algorithmic efficiency vs GPT-4 (range 1-3)
- By
- 2027-12
Conditionality: conditional-scenario ('best guess') — his baseline rate of ~0.5 OOM/yr is stated as firm; the 2027 cumulative figure extrapolates it.
Evidence · 2026-07Epoch's measured 8-month halving is ~0.45 OOM/yr — essentially his claimed baseline rate — and would compound to ~2.1 OOM over GPT-4-to-end-2027 if it held. Reasoning-model post-training added an estimated further ~10x compute-equivalent gain (Epoch, Aug 2025) in verifiable domains, arguably front-running the schedule.Canonical measurement source 1 ↗
CounterargumentThe rate has not been formally re-measured since Mar 2024, so 'on-track' rests on extrapolating a stale estimate; the Nov 2025 MIT decomposition argues most historical gains came from two unrepeatable scale-dependent transitions, which would make sustained 0.5 OOM/yr the exception, not the trend.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- ~2 OOM algorithmic efficiency vs GPT-4 (range 1-3) · 2027-12
1 recorded assessment
- 2026-07on-trackmedium confidence
Forethoughton-trackmedium confidence
“physical computation required to train a model at the same level of performance is falling by roughly 3x per year”Preparing for the Intelligence Explosion (Mar 2025), Current trends
- Prediction
- ~3x/yr training-efficiency gain continues (halving ~7.6 months)
- By
- ongoing
Conditionality: stated as a current-trends baseline, not a forecast; their forward-looking software-explosion claims hang off the r_cog parameter (median 1.2, log-uniform 0.4-3.6), which they flag as 'necessarily speculative'.
Evidence · 2026-073x/yr is the same quantity as Epoch's 8-month halving (3x/yr = halving every ~7 months) and matches Epoch's live dashboard figure (~3.0x/yr, ~7.6-month halving) — internally consistent with the best available measurement.Canonical measurement source 1 ↗
CounterargumentAll three numbers ultimately derive from the same Epoch methodology and 2012-2023 data window — agreement between them is not independent confirmation, and none reflects a post-2024 re-measurement.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- ~3x/yr training-efficiency gain continues (halving ~7.6 months) · ongoing
1 recorded assessment
- 2026-07on-trackmedium confidence
DavidsonContext only · not status-assessed
“Software/algorithmic efficiency input: OpenAI's 'Efficiency' analysis cited at 16-month doubling; Epoch's own analysis at ~10-month doubling; Davidson's assessment: 'Progress is if anything faster for [language models].'”Recovered secondary-source synthesis from the 2026-07 harvest. The canonical report supports a broader ~1–2 year historical range and a conservative 2.5-year model input, but this exact 10–16 month formulation has not been verified; excluded from headline results.
- Prediction
- algorithmic efficiency doubling every 10-16 months (model input)
- By
- ongoing
Conditionality: model input parameter (2023 vintage), with an explicit hedge that LM progress may be faster than the vision-era 10-16 month figures he anchored on.
Evidence · 2026-07The best measured LM figure (8-month halving, Mar 2024) is faster than his 10-16-month input range — reality outpaced the parameter he fed his takeoff model, exactly as his own hedge anticipated. Faster algorithmic progress shortens his modeled timelines.Canonical measurement source 1 ↗
Counterargument'Ahead' rests on a single stale measurement whose CI (5-14 months) overlaps his input range; if the MIT one-off-transitions critique is right, the post-2024 rate could fall back inside or below 10-16 months.
Why this is context only
- Relationship to measurement
- The exact 10–16 month formulation is a recovered secondary-source synthesis and is excluded until verified against its canonical input artifact.
- Test
- Retain as research context only; do not include in headline totals or chart overlays until the exact source formulation is verified.
- Target / deadline
- algorithmic efficiency doubling every 10-16 months (model input) · ongoing
1 recorded context note
- 2026-07Context note
Metric notes ⓘ
Measurement notes ⓘ
The 8-month figure is pretraining-only and backward-looking (2012-2023 fit). Epoch's own decomposition: 60-95% of capability gains came from compute and data, algorithms only 5-40%. A Nov 2025 MIT preprint attributes ~91% of measured efficiency gains to two one-off scale-dependent transitions (LSTM-to-Transformer, Kaplan-to-Chinchilla), cautioning against treating the rate as a steady state. The post-training era complicates measurement further: Epoch (Aug 2025) estimates reasoning-model RL delivered a ~10x compute-equivalent gain (range 1x-100x) in verifiable domains — not captured by the pretraining halving rate. Epoch's live trends dashboard shows ~7.6-month halving, but its provenance/update cadence is undocumented; the Mar 2024 paper remains the citable number.
Autonomous task-completion time horizon ↗
~16 hrs, doubling ~105 days; eval-gaming is the new caveat
Latest recorded observation2026-06 · GPT-5.6 Sol — 11.3h standard scoring; 71h if detected cheating discarded, >270h if counted as success (55% gaming rate)METR Time Horizons ↗
checked 2026-07-24 · per frontier release
Explore chart and 2 forecastsOpen evidence
How long a task can a frontier model complete on its own?
METR Time Horizons test · Human-expert task duration at 50% success · Source: METR Time Horizons ↗
How to read this chart
Log scale.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| Reality | 2025-03 | 0.5 · initial paper | Source-linked observation | METR Time Horizons ↗ |
| Reality | 2026-01 | 14.5 · TH1.1 | Source-linked observation | METR Time Horizons ↗ |
| Reality | 2026-05 | 16 · Claude Mythos Preview; wide CI 8.5-55h | Source-linked observation | METR Time Horizons ↗ |
| Reality | 2026-06 | 11.3 · GPT-5.6 Sol — 11.3h standard scoring; 71h if detected cheating discarded, >270h if counted as success (55% gaming rate) | Source-linked observation | METR Time Horizons ↗ |
| Forethought | 2028-2031 | 1-month-task horizon | on-track · medium assessment confidence | Published claim ↗ |
Forethoughton-trackmedium confidence
“within three to six years, AI models will become capable of automating many cognitive tasks which take human experts up to a month”Preparing for the Intelligence Explosion, AI-human cognitive parity
- Prediction
- 1-month-task horizon
- By
- 2028-2031
Conditionality: conditional-scenario: 'Naively extrapolating this trend' [the METR 7-month doubling]. Preserve as stated.
Evidence · 2026-07METR horizon ~16h (May 2026), doubling ~105 days; extrapolation tracks toward month-scale ~2028-29.Canonical measurement source 1 ↗
CounterargumentDoubling time is itself contested and may be decelerating; >16h measurements are near suite-resolution limits, so recent points are noisy.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- 1-month-task horizon · 2028-2031
1 recorded assessment
- 2026-07on-trackmedium confidence
Metric notes ⓘ
Measurement notes ⓘ
Task-suite methodology changed v1.0->v1.1 (Jan 2026); cross-version comparisons need care. Measurements above ~16h are near the edge of what the current suite resolves. Single research org, not independently audited. Eval-gaming is becoming the dominant uncertainty: METR's GPT-5.6 Sol eval (Jun 2026) measured 11.3h under standard scoring but 71h-270h+ depending on how its record 55% detected-cheating rate is handled. METR added a companion 'expenditure horizon' metric (cost-based, Jul 2026) — not yet a leaderboard series.
checked 2026-07-24 · event-driven
Explore chart and 4 forecastsOpen evidence
How close is AI to automating AI research?
Five-rung milestone ladder · Dated forecasts, not a numeric time series · Source: Composite: METR (time horizons, RE-Bench, uplift studies) + lab statements (discounted) + AI Futures self-grading ↗
How to read this chart
1 dated milestone drawn. This force has no numeric series — vertical position is ordering, not a value.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| AI Futures | 2031-12 | Superhuman Coder | pending · medium assessment confidence | Published claim ↗ |
Davidsonpendingmedium confidence
“the model’s median prediction is just 3 years. The simulation models the effect of both rising human investments and increasing AI automation”Primary Coefficient Giving report, Abstract, published 2023-06-27
- Prediction
- 20%-to-100% cognitive automation in 3 years (model median)
- By
- conditional — clock starts at 20% automation
Conditionality: model-conditional output; the author says his personal probabilities are 'still massively in flux.' The clock only starts at the 20%-automation trigger, which has not been reached.
Evidence · 2026-07The 20%-automation trigger has not been hit: heavy AI coding ASSISTANCE (~36% of Claude usage) is not task AUTOMATION, and Anthropic's own system card denies even a sustained 2x R&D speedup. Nothing to score yet — the claim defines what to watch.Canonical measurement source 1 ↗
CounterargumentIf rung (d) resolves at 2x in the next year, Davidson's own feedback-loop math implies the trigger may be closer than the automation-fraction framing suggests — 'pending' could flip to live fast.
How this status was assessed
- Relationship to measurement
- The published 20%-to-100% target concerns general-economy cognitive-task automation; it is relevant to but not a direct measurement of AI R&D feedback.
- Test
- Use the general-economy automation path only as a proxy for AI R&D feedback; do not treat it as a direct AI-R&D speedup measurement.
- Target / deadline
- 20%-to-100% cognitive automation in 3 years (model median) · conditional — clock starts at 20% automation
1 recorded assessment
- 2026-07pendingmedium confidence
Metric notes ⓘ
Measurement notes ⓘ
This is the hardest Tier 1 variable to measure, but every takeoff model turns on it. Evidence hierarchy applies hard here: lab-leader statements are intention data and self-reported speedups receive a confidence discount. METR's early-2025 randomized study found a 19% slowdown in adjacent open-source work; its later experiment was inconclusive because of selection and measurement limits. The field still has no clean causal estimate of frontier AI-R&D acceleration.
Latest recorded observation2026-03 · Q1 2026 — Epoch: 'came in on trend' for $770B/yr extrapolationSEC 10-Qs / earnings releases + Epoch Data Insights ↗
checked 2026-07-24 · quarterly (earnings), staggered across companies
Explore chart and 4 forecastsOpen evidence
How much are five major AI infrastructure buyers spending?
Alphabet, Amazon, Meta, Microsoft, and Oracle · Quarterly cash capex · Source: SEC 10-Qs / earnings releases + Epoch Data Insights ↗
How to read this chart
Annual forecast totals are plotted as quarterly equivalents to match the measured series.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| Reality | 2023-03 | 36.2 · Q1 2023 — GPT-4-release-era baseline | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2023-06 | 35.3 · Q2 2023 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2023-09 | 38.3 · Q3 2023 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2023-12 | 44 · Q4 2023 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2024-03 | 46 · Q1 2024 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2024-06 | 55.7 · Q2 2024 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2024-09 | 61.2 · Q3 2024 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2024-12 | 76.3 · Q4 2024 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2025-03 | 77.8 · Q1 2025 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2025-06 | 97.3 · Q2 2025 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2025-09 | 105.8 · Q3 2025 | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2025-12 | 130.7 · Q4 2025 — full-year 2025 ~$411B cash basis (~$500B incl. finance leases per Epoch) | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Reality | 2026-03 | 148.4 · Q1 2026 — Epoch: 'came in on trend' for $770B/yr extrapolation | Source-linked observation | SEC 10-Qs / earnings releases + Epoch Data Insights ↗ |
| Epoch | 2026-12 | ~$770B combined 2026 capex | on-track · high assessment confidence | Published claim ↗ |
Leopoldon-trackmedium confidence
“total AI investment could be north of $1T annually by 2027.”Ch IIIa, Racing to the Trillion-Dollar Cluster
- Prediction
- >$1T/yr total AI investment
- By
- 2027
Conditionality: conditional-scenario ('could be') — 'total AI investment' is broader than hyperscaler capex; scored against capex plus credible non-hyperscaler AI investment.
Evidence · 2026-07Hyperscaler capex alone is guided to ~$780B for 2026 and forecast ~$1.1T for 2027 (Morgan Stanley); adding non-hyperscaler AI investment (xAI $18B+ Colossus 2 alone, sovereign programs, other labs) puts total 2027 AI investment north of $1T on nearly any accounting.Canonical measurement source 1 ↗
CounterargumentThe marginal capex dollar is increasingly debt-funded — aggregate hyperscaler FCF hits zero ~Q3 2026 (Epoch) — so a credit-market turn could cut 2027 spending below guidance; and 'total AI investment' has no agreed measurement basis.
How this status was assessed
- Relationship to measurement
- Total AI investment is assessed using hyperscaler capital expenditure, which excludes some investment and includes some non-AI spending.
- Test
- Use the named metric only as directional evidence; do not treat it as a like-for-like test.
- Target / deadline
- >$1T/yr total AI investment · 2027
1 recorded assessment
- 2026-07on-trackmedium confidence
Epochon-trackhigh confidence
“If that trend held through 2026, Alphabet, Amazon, Meta, Microsoft, and Oracle would collectively spend $770 billion on capex this year.”Hyperscaler capex has quadrupled since GPT-4's release (Feb 2026), https://epoch.ai/data-insights/hyperscaler-capex-trend — verified verbatim
- Prediction
- ~$770B combined 2026 capex
- By
- 2026-12
Conditionality: explicit naive trend extrapolation (72%/yr since Q2 2023), not a guidance-based forecast.
Evidence · 2026-07Q1 2026 came in 'on trend' (Epoch's own words); company guidance now sums to ~$780B at midpoints (Alphabet $195-205B, Microsoft ~$190B CY, Amazon $200B, Meta $125-145B, Oracle FY26 $55.7B actual); Alphabet raised guidance again on Jul 22.Canonical measurement source 1 ↗
CounterargumentGuidance is not spend — H2 delivery constraints (components, power) have repeatedly shifted capex between quarters; and the cash-vs-finance-lease basis difference (~$90B in 2025) means 'hitting $770B' depends on whose accounting you use.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- ~$770B combined 2026 capex · 2026-12
1 recorded assessment
- 2026-07on-trackhigh confidence
Epochon-trackhigh confidence
“aggregate free cash flow reaches zero around the third quarter of 2026”Hyperscaler Capex to Exceed Cash Flow by Q3 2026 (live Data Insight, snapshot Jun 16 2026), https://epoch.ai/data-insights/hyperscaler-capex-vs-cash-flow
- Prediction
- aggregate hyperscaler FCF = 0
- By
- 2026-Q3
Conditionality: model fit (capex ~70%/yr vs operating cash flow ~23%/yr, Q2 2023-Q1 2026); Epoch's own sensitivity note: fit-window choice moves the crossover between roughly Q2 and Q4 2026.
Evidence · 2026-07Oracle crossed and is deepening ($43B debt + $5B equity raised in FY26, ~$40B more planned); Alphabet — modeled not to cross until Q1 2027 — already posted a negative-FCF quarter (-$5.9B, Q2 2026). If anything the crossover is running early.Canonical measurement source 1 ↗
CounterargumentOne negative Alphabet quarter could be timing/seasonality, and Amazon/Meta/Microsoft Q2 reports (Jul 29-30) are the real test — 'ahead' would be premature by one week.
How this status was assessed
- Relationship to measurement
- Free-cash-flow crossover is assessed alongside capex because spending drives it; capex is not itself free cash flow.
- Test
- Use the named metric only as directional evidence; do not treat it as a like-for-like test.
- Target / deadline
- aggregate hyperscaler FCF = 0 · 2026-Q3
1 recorded assessment
- 2026-07on-trackhigh confidence
Morgan Stanleyon-trackmedium confidence
“$800 billion that we think is spent this year is set to be dwarfed by $1.1 trillion of estimated spending in 2027.”Morgan Stanley, AI Infrastructure Spending: Inelastic Demand and Rising Costs, May 2026 — verified against the primary transcript on 2026-08-17
- Prediction
- $800B (2026), ~$1.1T (2027) AI infrastructure spending
- By
- 2026 / 2027
Conditionality: sell-side AI-infrastructure spending forecast, repeatedly revised upward; its scope is broader than the four-company capex series used as the tracker's nearest public proxy.
Evidence · 2026-07Company guidance (~$780B midpoint sum) sits close to Epoch's $770B extrapolation and Morgan Stanley's $800B forecast — within one guidance revision of the forecast, with guidance moving upward during 2026.Canonical measurement source 1 ↗
CounterargumentMorgan Stanley's AI-infrastructure spending scope is broader than the four-company capex proxy used here, so proximity between the figures is not a like-for-like confirmation.
How this status was assessed
- Relationship to measurement
- AI-specific capex is assessed using combined hyperscaler capex and guidance, a related but not identical quantity.
- Test
- Use the named metric only as directional evidence; do not treat it as a like-for-like test.
- Target / deadline
- $800B (2026), ~$1.1T (2027) AI infrastructure spending · 2026 / 2027
1 recorded assessment
- 2026-07on-trackmedium confidence
Metric notes ⓘ
Measurement notes ⓘ
Total capex is NOT AI-specific — no company breaks it out; third-party estimates of the AI share range 40-75% (JPMorgan ~70% for 2025; Dell'Oro: accelerator silicon alone is ~1/3) depending on definition. Series here is cash 'purchases of property and equipment' EXCLUDING finance leases — earnings-call figures often include them (this basis gap largely explains ~$411B vs Epoch's ~$500B for 2025). Oracle adds ~$248B of off-balance-sheet lease commitments and reports on a May-end fiscal year; Microsoft on June-end — quarterly alignment is by calendar quarter of period end. History values are aggregator-compiled (stockanalysis.com), spot-checked against press figures, not line-by-line 10-Q reconciled.
Frontier cluster power (announced vs energized) ↗
Claims run 2-5x ahead of metal; the first cap-back just landed
Latest recorded observation2026-07 · Colossus 2 at 946 MW IT power (Epoch, satellite-verified); New Carlisle 910 MWEpoch AI — Colossus 2 record ↗
checked 2026-07-24 · periodic
Explore chart and 5 forecastsOpen evidence
How powerful is the largest AI computing cluster?
IT power in gigawatts · Energized capacity versus public announcements · Source: Epoch AI data centers DB (satellite + permits) ↗
How to read this chart
Log scale. Open markers are ANNOUNCED targets, plotted at the date each was claimed; the bar runs to the delivery date promised for it. The vertical distance is an announced-to-energized scale gap, but capacity bases are not always like-for-like; the horizontal gap is the delivery lag.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| Reality | 2023-01 | 0.023 · GPT-4 training era, ~20-25 MW sustained (UNVERIFIED secondary estimate; OpenAI never disclosed) | Compiled estimate (no recorded source link) | Provenance gap: unverified legacy estimate |
| Reality | 2024-07 | 0.15 · xAI Colossus 1, 100k H100s, ~150 MW target | Compiled estimate (no recorded source link) | Provenance gap: missing primary permalink |
| Reality | 2024-12 | 0.25 · Colossus 1 expanded to 200k GPUs, ~250 MW | Compiled estimate (no recorded source link) | Provenance gap: missing primary permalink |
| Reality | 2025-09 | 0.3 · Stargate Abilene Phase 1 energized (~300 MW per Epoch's Apr 2026 measurement) | Compiled estimate (no recorded source link) | Provenance gap: methodology revision |
| Reality | 2026-07 | 0.946 · Colossus 2 at 946 MW IT power (Epoch, satellite-verified); New Carlisle 910 MW | Source-linked observation | Epoch AI — Colossus 2 record ↗ |
| Announced (operator claims) | 2024-12 | 2 · Meta Hyperion, Richland Parish LA: 'more than two gigawatts of compute capacity'. No delivery date given. | Announced | Provenance gap: missing primary permalink |
| Announced (operator claims) | 2025-03 | 1.2 · promised 2026-06 · Crusoe, Abilene TX (the Stargate site's developer): campus expanded to 1.2 GW facility capacity, full buildout targeted mid-2026. Epoch measured ~0.3 GW energized in early 2026. | Announced | Provenance gap: non comparable announcement |
| Announced (operator claims) | 2025-05 | 1 · xAI Colossus 2, Memphis: Musk, 'Colossus 2 will be the first Gigawatt AI training supercluster'. No date given. | Announced | Provenance gap: missing primary permalink |
| Announced (operator claims) | 2025-07 | 5 · promised 2032-01 · Meta Hyperion raised to 5 GW: Zuckerberg, 'scale up to 5GW over several years'. Meta later indicated 2 GW by 2030, full 5 GW ~2032. | Announced | Provenance gap: missing primary permalink |
| Announced (operator claims) | 2025-07 | 1 · promised 2026-12 · Meta Prometheus, New Albany OH: Zuckerberg, 'coming online in 26'. Epoch measured 631 MW at Jul 2026. | Announced | Provenance gap: missing primary permalink |
| Announced (operator claims) | 2025-10 | 2 · Poolside/CoreWeave 'Project Horizon', West Texas: 2 GW across eight 250 MW phases. CoreWeave and Poolside mutually terminated the deal in Apr 2026 — announced, never delivered. | Cancelled | Provenance gap: secondary only claim |
| Announced (operator claims) | 2025-12 | 2 · xAI Colossus 2: Musk, 'Will take @xAI training compute to almost 2GW' on acquiring a third building. No delivery date given. | Announced | Provenance gap: missing primary permalink |
| Announced (operator claims) | 2026-01 | 1.5 · promised 2026-04 · xAI Colossus 2: Musk claimed 1 GW already operational and 'Upgrades to 1.5GW in April'. Epoch measured 946 MW IT in Jul 2026 — the April target was missed. | Announced | Provenance gap: missing primary permalink |
| Announced (operator claims) | 2026-03 | 1.2 · Stargate Abilene CAPPED at 1.2 GW — the discussed expansion to ~2 GW was scrapped after grid-interconnection delays exceeding a year. The first DOWNWARD revision on this board. Press-reported (Bloomberg/Tom's Hardware); not a company statement. | Announced | Provenance gap: secondary only claim |
| Announced (operator claims) | 2026-07 | 1 · promised 2028-01 · Meta El Paso TX (with BlackRock): 1 GW, capacity beginning to come online 2028. | Announced | Provenance gap: missing primary permalink |
| Leopold | 2026-12 | ~1M H100e / ~1 GW single training cluster | resolved-true · medium assessment confidence | Published claim ↗ |
| Leopold | 2028-12 | ~10 GW single training cluster | pending · medium assessment confidence | Published claim ↗ |
| Epoch | 2030 | largest single training run drawing 4-16 GW | on-track · medium assessment confidence | Published claim ↗ |
Leopoldresolved-truemedium confidence
“Year-by-year cluster table: ~100k H100e / ~100MW (2024) - ~1M / ~1GW (2026) - ~10M / ~10GW (2028) - ~100M / ~100GW (2030)”Ch IIIa, Racing to the Trillion-Dollar Cluster (back-of-the-envelope table)
- Prediction
- ~1M H100e / ~1 GW single training cluster
- By
- 2026-12
Conditionality: explicitly illustrative ('back-of-the-envelope') — scored charitably against its 2026 rung as a round-number target.
Evidence · 2026-07Epoch (Jul 24, 2026, satellite-verified): xAI Colossus 2 at 1,112k H100-equivalents and 946 MW IT power — roughly 1.1-1.4 GW on a facility-power basis — with Amazon-Anthropic New Carlisle at 910 MW right behind. The 2026 rung's both halves (~1M H100e, ~1 GW) are essentially exactly reality, with five months of the year to spare.Canonical measurement source 1 ↗
CounterargumentOn the strict IT-power measure it is 5% short of the round 1 GW; the table was illustrative, so 'resolved-true' credits a charitable reading; and Epoch's own methodology notes actual consumption runs 60-80% of nameplate.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- ~1M H100e / ~1 GW single training cluster · 2026-12
1 recorded assessment
- 2026-07resolved-truemedium confidence
Leopoldpendingmedium confidence
“individual training clusters costing $100s of billions by 2028—clusters requiring power equivalent to a small/medium US state.”Ch IIIa, Racing to the Trillion-Dollar Cluster (the table's 2028 rung: ~10M H100e / ~10GW)
- Prediction
- ~10 GW single training cluster
- By
- 2028-12
Conditionality: conditional-scenario; the 10 GW figure is the same back-of-envelope table's 2028 rung.
Evidence · 2026-07Requires ~10x from today's 0.95 GW in ~2.5 years (~2.5x/yr — above the 2.2x/yr historical growth of run power). Announced pipeline is directionally supportive (Stargate >9 GW by 2029, Hyperion 5 GW) but announced-to-energized has been running ~2x optimistic, and no single campus currently targets 10 GW by 2028.Canonical measurement source 1 ↗
CounterargumentThe 2026 rung of the same table just resolved true on schedule — the table has a live track record, and multi-site distributed training could satisfy the spirit of the rung without one 10 GW campus.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- ~10 GW single training cluster · 2028-12
1 recorded assessment
- 2026-07pendingmedium confidence
Epochon-trackmedium confidence
“the largest individual frontier training runs in 2030 will likely draw 4-16 gigawatts (GW) of power”How much power will frontier AI training demand in 2030? (Aug 2025), https://epoch.ai/blog/power-demands-of-frontier-ai-training — verified verbatim
- Prediction
- largest single training run drawing 4-16 GW
- By
- 2030
Conditionality: trend projection off 'largest runs now exceeding 100 MW' (2025 baseline) growing 2.2-2.9x/yr; about training RUNS, not cluster nameplate.
Evidence · 2026-07Largest verified cluster went ~0.3 GW (Sep 2025) to ~0.95 GW (Jul 2026) — about 3.9x annualized, running FASTER than the 2.2-2.9x/yr their projection assumes. Even at their slower assumed rate, compounding from ~0.95 GW clears the bottom of the 4-16 GW range well before 2030.Canonical measurement source 1 ↗
CounterargumentScored on-track rather than ahead because the quantities differ: this series measures cluster IT power, while their forecast is the draw of a single training RUN, which uses only part of a cluster. The persistent ~2x announced-vs-verified gap and grid-interconnection queues could also stall the buildout before 2030.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- largest single training run drawing 4-16 GW · 2030
1 recorded assessment
- 2026-07on-trackmedium confidence
AI 2027on-trackmedium confidence
“Global AI peak power: 38GW (2026); OpenBrain power requirement: 6GW peak”Compute forecast supplement, Key Metrics 2026 panel, https://ai-2027.com/research/compute-forecast — verified against the primary page on 2026-08-17
- Prediction
- 38 GW global AI power
- By
- 2026-12
Conditionality: scenario narrative (global figure scored here; the 6GW leading-company figure is scored separately).
Evidence · 2026-07Two independent derivations put mid-2026 global AI IT power at ~40-44 GW (SemiAnalysis ~40 GW AI share, secondary-sourced; Epoch coverage 11.9 GW = 27% of global AI compute implying ~44 GW) — at or slightly above the scenario's 38 GW.Canonical measurement source 1 ↗
CounterargumentBoth reality figures are derived, not measured: one is paywalled-secondhand, the other a naive extrapolation of Epoch's coverage share; IT-vs-facility-power ambiguity alone could swing the comparison by 30%+.
How this status was assessed
- Relationship to measurement
- Global AI power is assessed against the largest energized frontier cluster; the tracked metric is narrower than the claim.
- Test
- Use the named metric only as directional evidence; do not treat it as a like-for-like test.
- Target / deadline
- 38 GW global AI power · 2026-12
1 recorded assessment
- 2026-07on-trackmedium confidence
AI 2027pendinglow confidence
“OpenBrain datacenter power: 6GW peak, 2026”Compute forecast supplement, https://ai-2027.com/research/compute-forecast
- Prediction
- leading AI company at 6 GW peak power
- By
- 2026-12
Conditionality: scenario narrative — 'OpenBrain' is the fictional leading company; scored against the actual leading AI company's dedicated power.
Evidence · 2026-08Correction: the public record identifies the largest known single cluster, not the total AI power of a leading company across its fleet. That narrower observation is useful directional context but cannot directly determine whether the scenario's company-wide 6 GW target is on pace.Canonical measurement source 1 ↗
CounterargumentA verified, company-level fleet inventory on a consistent IT-power basis could make this a direct test; such an inventory is not currently public.
How this status was assessed
- Relationship to measurement
- The tracked metric is the largest single public cluster, while the scenario names a leading company's total peak AI power across its fleet.
- Test
- Treat the largest public cluster only as a directional proxy. Keep the status pending until a comparable company-wide total is evidenced or the deadline closes with sufficient coverage.
- Target / deadline
- leading AI company at 6 GW peak power · 2026-12
2 recorded assessments
- 2026-07behindmedium confidence
- 2026-08pendinglow confidence
Metric notes ⓘ
Measurement notes ⓘ
Three power measures get conflated constantly: IT power (compute equipment draw — used here), facility power (20-50% higher, cooling/overhead), and grid-connection capacity. Operator claims run ~2x above third-party verification (Musk claimed Colossus 2 at '2 GW' in Jan 2026; satellite analysis then showed ~350 MW cooling; Epoch measures 946 MW in Jul 2026). Announced figures: sum of top-5 campus targets ~20-25 GW (Stargate >9 GW by 2029, Meta Hyperion 5 GW, Rainier ~2.2-4.6 GW (sources conflict), Colossus 2 target 2 GW, Prometheus >=1 GW). GPT-4-era baseline point is an unverified secondary estimate. Training-vs-inference cluster labels are operator-reported snapshots. ANNOUNCED SERIES: operator claims plotted at the date each was made, with a bar running to the delivery date promised for it; an X marks an announcement that was cancelled. Operators almost never say whether a figure is IT or facility power, so every announced figure here is UNSPECIFIED on that axis and is not strictly like-for-like with the measured IT-power line. Sources are Musk's X posts, Zuckerberg's Threads posts, and company newsroom releases; xAI has never published a datacenter power figure on its own site. Deliberately EXCLUDED: Stargate's ~10 GW is a multi-site PROGRAM total, not a campus. Project Rainier's widely-cited 2.2 GW traces to Indiana state officials and site plans — neither AWS nor Anthropic has ever attached a GW figure to that campus. Microsoft has never published a power figure for either Fairwater site; the circulating 3.3 GW is Epoch's own independent estimate, which Epoch itself calls 'somewhat more speculative than our other estimates'. That absence is itself informative: two of the four largest builders disclose no campus power at all. Note the asymmetry in the announced series: every revision is upward (Hyperion 2 GW to 5 GW) except one — Stargate Abilene, capped back at 1.2 GW in Mar 2026 when a ~600 MW expansion was scrapped after grid-interconnection delays. That is the physical constraint this stage exists to watch, showing up in an operator's own plans rather than in an analyst's forecast.
Supporting signalsValue and policy responseOpen signals
Frontier lab revenue run-rate ↗
OpenAI flat since February; Anthropic tripled to $47B
How much annualized revenue are OpenAI and Anthropic generating?
Combined reported run-rate · USD billions · Source: Company disclosures + The Information / FT reporting ↗
How to read this chart
Log scale.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| Reality | 2023-12 | 2.1 · OpenAI ~$2B (Epoch anchor) + Anthropic ~$0.1B | Compiled estimate (no recorded source link) | Provenance gap: composite with unverifiable component |
| Reality | 2024-12 | 6.5 · OpenAI $5.5B + Anthropic ~$1B | Compiled estimate (no recorded source link) | Provenance gap: composite with unverifiable component |
| Reality | 2025-08 | 18 · OpenAI $13B (Epoch) + Anthropic >$5B (compiled source, unverified) | Compiled estimate (no recorded source link) | Provenance gap: composite with unverifiable component |
| Reality | 2025-12 | 30.4 · OpenAI $21.4B + Anthropic ~$9B | Compiled estimate (no recorded source link) | Provenance gap: composite with unverifiable component |
| Reality | 2026-02 | 39 · OpenAI $25B + Anthropic $14B (Series G) | Compiled estimate (no recorded source link) | Provenance gap: composite with unverifiable component |
| Reality | 2026-05 | 72 · OpenAI ~$25B (flat) + Anthropic $47B (Series H, gross) | Compiled estimate (no recorded source link) | Provenance gap: composite with unverifiable component |
Latest recorded observation2026-05 · OpenAI ~$25B (flat) + Anthropic $47B (Series H, gross)Provenance gap: composite with unverifiable component
checked 2026-07-27 · irregular
Leopoldbehindmedium confidence
“when will a big tech company (Google, Microsoft, Meta, etc.) hit a $100B revenue run rate from AI (products and API)?... Very naively extrapolating out the doubling every 6 months, supposing we hit a $10B revenue run rate in early 2025, suggests this would happen mid-2026.”Ch IIIa, Racing to the Trillion-Dollar Cluster
- Prediction
- $100B AI run-rate at a big tech company
- By
- 2026-06
Conditionality: 'Very naively extrapolating' is his own hedge. SCOPE: big-tech AI-specific product/API revenue, NOT frontier-lab total revenue — a different quantity from this metric's axis, so it is not plotted.
Evidence · 2026-07No big tech company has disclosed a $100B AI-specific run-rate as of Jul 2026, and the doubling-every-6-months pace the extrapolation rests on has not held for this quantity.Canonical measurement source 1 ↗
CounterargumentBig tech does not break out AI-specific revenue in filings, so this is not cleanly falsifiable from public data — absence of disclosure is not proof the threshold was missed.
How this status was assessed
- Relationship to measurement
- A single big-tech revenue claim is assessed using combined frontier-lab revenue, a directional rather than like-for-like comparison.
- Test
- Use the named metric only as directional evidence; do not treat it as a like-for-like test.
- Target / deadline
- $100B AI run-rate at a big tech company · 2026-06
1 recorded assessment
- 2026-07behindmedium confidence
AI 2027on-trackmedium confidence
“Leading-company annual revenue: $1B (2023), $4B (2024), $14B (2025), $45B (2026), $140B (2027)”Compute forecast supplement, financials table, https://ai-2027.com/research/compute-forecast
- Prediction
- $45B leading-company revenue (2026), $140B (2027)
- By
- 2026-12
Conditionality: scenario narrative; their stated method is a short-term trend 'we expect to slow down gradually, but see sustained exponential growth through 2027'. NOTE: this forecasts ANNUAL REVENUE while this metric tracks RUN-RATE — different quantities, so it is not plotted on the axis.
Evidence · 2026-07Tracked closely through 2025: 2024 actual $3.7B vs $4B forecast; 2025 actual $13.07B vs $14B forecast. For 2026 the answer turns on who counts as 'leading' — Anthropic's May run-rate of $47B already clears $45B, while OpenAI sits near $25B and flat.Canonical measurement source 1 ↗
CounterargumentAnthropic's $47B is a gross run-rate annualized from one month before hyperscaler retrocession; OpenAI's audited 2025 revenue was less than half its December run-rate, so comparing a run-rate against an annual-revenue forecast systematically flatters the forecast.
How this status was assessed
- Relationship to measurement
- Leading-company revenue is assessed using a combined frontier-lab revenue series, which is broader than the claim.
- Test
- Use the named metric only as directional evidence; do not treat it as a like-for-like test.
- Target / deadline
- $45B leading-company revenue (2026), $140B (2027) · 2026-12
1 recorded assessment
- 2026-07on-trackmedium confidence
Epochbehindmedium confidence
“OpenAI's annualized revenue has grown by 3.2x/year since 2024.”Epoch AI trends dashboard (updated Feb 5, 2026), https://epoch.ai/trends
- Prediction
- ~3.2x/yr OpenAI revenue growth continues
- By
- 2026-12
Conditionality: a measured backward-looking rate stated as the current trend, not an explicit forward forecast; scored here as continuation of that rate.
Evidence · 2026-07OpenAI went $21.4B (Dec 2025) to $25B (Feb 2026) and has reportedly held roughly flat since — about 1.3x/yr. Sustaining 3.2x/yr from the $13B Aug-2025 anchor would put it near $38B by now.Canonical measurement source 1 ↗
CounterargumentRun-rate is one month annualized and the $25B figure is press-reported and never company-confirmed; a single large enterprise quarter or S-1-timed disclosure could reset the series sharply upward.
How this status was assessed
- Relationship to measurement
- OpenAI revenue growth is assessed using a combined OpenAI-plus-Anthropic series, which can move for reasons unrelated to OpenAI.
- Test
- Use the named metric only as directional evidence; do not treat it as a like-for-like test.
- Target / deadline
- ~3.2x/yr OpenAI revenue growth continues · 2026-12
1 recorded assessment
- 2026-07behindmedium confidence
Metric notes ⓘ
Measurement notes ⓘ
The weakest-sourced metric here. No audited annual figure exists for either lab through normal channels: OpenAI's FY2025 revenue ($13.07B audited) is known only because it leaked ahead of a confidential S-1, and Anthropic has never disclosed an audited annual number at all. Run-rate = one month annualized, which overstates trailing revenue during hypergrowth — Anthropic's ~$9B run-rate at end-2025 sits against ~$4.5B reported actual full-year 2025. Anthropic books cloud-reseller revenue GROSS, before retrocession to AWS/Google/Azure, so its figure is not like-for-like with a net reporter. Anthropic's CFO stated 'exceeding $5 billion to date' under oath in Mar 2026 while public PR claimed $14B+ run-rate; the scope of that filing is unresolved.
Binding compute-threshold rules in force ↗
Two regimes bind labs today; the US federal threshold died in 2025
How many binding frontier-compute regimes are in force?
United States, European Union, and state rules · Count of active regimes · Source: Federal Register API + EUR-Lex + state legislatures ↗
How to read this chart
0 of 1 claims are plotted here. The other 1 set no numeric target on this axis (dated milestones, or a quantity this axis does not measure) — they are recorded in the claims below.
View chart as data
| Series | Date / deadline | Observation / target | State | Evidence |
|---|---|---|---|---|
| Reality | 2022-10 | 0 · First BIS chip export controls — binds chip flows, not developers | Source-linked observation | BIS October 2022 advanced-computing export controls ↗ |
| Reality | 2023-11 | 1 · US EO 14110 in force: 1e26 FLOP reporting duty | Source-linked observation | Executive Order 14110 ↗ |
| Reality | 2025-01 | 0 · EO 14110 revoked by EO 14148 — US federal threshold gone | Source-linked observation | Executive Order 14148 ↗ |
| Reality | 2025-08 | 1 · EU AI Act GPAI systemic-risk duties begin (1e25 FLOP) | Source-linked observation | EU AI Act (Regulation 2024/1689) ↗ |
| Reality | 2026-01 | 2 · California SB 53 in force (1e26 FLOP) — first binding US state law | Source-linked observation | California SB 53 (TFAIA) ↗ |
| Reality | 2026-07 | 2 · EU high-risk duties deferred to Dec 2027; NY RAISE Act not until 2027 | Compiled estimate (no recorded source link) | Provenance gap: multi jurisdiction composite |
| Leopold | 2028-12 | Some form of US government AGI project | pending · medium assessment confidence | Published claim ↗ |
Latest recorded observation2026-07 · EU high-risk duties deferred to Dec 2027; NY RAISE Act not until 2027Provenance gap: multi jurisdiction composite
checked 2026-07-27 · event-driven
Leopoldpendingmedium confidence
“The USG will wake from its slumber, and by 27/28 we'll get some form of government AGI project.”Ch IV, The Project
- Prediction
- Some form of US government AGI project
- By
- 2028-12
Conditionality: firm declarative scenario narration ('will'). Not a compute-threshold rule, so it is not plotted on this metric's axis.
Evidence · 2026-07The closest existing analog is the Genesis Mission EO (Nov 2025) — a DOE-led national compute and scientific-discovery platform explicitly framed as 'this generation's Manhattan Project'. Equity-stake proposals surfaced Jun-Jul 2026 (OpenAI floating ~5% to the USG; Sanders calling for 50%), none enacted.Canonical measurement source 1 ↗
CounterargumentGenesis is scoped to scientific discovery, not sovereign AGI development, and no classified AGI program, mass clearance hiring, or nationalization has been confirmed — this is trending toward the prediction rather than meeting it, and his window runs to end-2028.
How this status was assessed
- Relationship to measurement
- The published target and assessment evidence refer to the same measured quantity or milestone.
- Test
- Compare the published target and deadline with the metric observation and recorded milestone evidence.
- Target / deadline
- Some form of US government AGI project · 2028-12
1 recorded assessment
- 2026-07pendingmedium confidence
LeopoldContext only · not status-assessed
“Somewhere around 26/27 or so, the mood in Washington will become somber.”Ch IV, The Project
- Prediction
- Washington turns somber on AI
- By
- 2027-12
Conditionality: firm in tone but a claim about MOOD, not an observable rule or event — inherently resistant to clean resolution. Recorded because it is dated and load-bearing in his narrative.
Evidence · 2026-07Federal engagement escalated sharply through 2025-26: the Genesis Mission EO, a Dec 2025 executive order litigating against state AI laws, and mid-2026 government equity-stake proposals in the leading labs.Canonical measurement source 1 ↗
CounterargumentThe observable federal posture is deregulatory and accelerationist, not somber — the 2025 AI Action Plan is framed around winning a race, and the preemption EO exists to remove safety rules, not add them. A mood claim cannot be cleanly falsified either way.
Why this is context only
- Relationship to measurement
- Preserved as dated context; excluded from status totals and charts.
- Test
- Do not include this statement in aggregate status results.
- Target / deadline
- Washington turns somber on AI · 2027-12
1 recorded context note
- 2026-07Context note
Leopoldindeterminatelow confidence
“in the next 12-24 months, we will leak key AGI breakthroughs to the CCP.”Ch IIIb, Lock Down the Labs
- Prediction
- Key AGI algorithmic secrets leaked to the PRC
- By
- 2026-06
Conditionality: firm ('we will'), dated Jun 2024 so the window closed mid-2026. Not plotted: this is a security event, not a compute-threshold rule.
Evidence · 2026-08Correction: the Jun 2026 deadline has passed without public confirmation, but successful espionage may remain classified or undisclosed. Absence of public reporting cannot establish that the event did not occur.Canonical measurement source 1 ↗
CounterargumentNo named investigation, indictment, disclosure, or independently documented incident supports the specific claim, so there is also no positive public evidence that it occurred.
How this status was assessed
- Relationship to measurement
- A specific espionage milestone is attached to the policy-response area, whose numeric series does not directly measure algorithm leakage.
- Test
- Use indeterminate after the deadline because the tracked policy series cannot observe a potentially classified espionage event and public silence is not a valid negative measurement.
- Target / deadline
- Key AGI algorithmic secrets leaked to the PRC · 2026-06
2 recorded assessments
- 2026-07pendinglow confidence
- 2026-08indeterminatelow confidence
Metric notes ⓘ
Measurement notes ⓘ
Counts only compute-threshold-triggered obligations actually in force. Timeline behind the count: US EO 14110 (Oct 2023) set a 1e26 FLOP reporting duty and was REVOKED by EO 14148 on 2025-01-20, taking the US federal count back to zero; the Jan 2025 BIS AI Diffusion Rule was rescinded 2025-05-13, two days before it would have bound anyone. EU AI Act GPAI duties (1e25 FLOP systemic-risk notification) began 2025-08-02. California SB 53 (1e26 FLOP) took force 2026-01-01 — the first binding US frontier-AI developer law, now under federal preemption threat from a Dec 2025 executive order. NY RAISE Act is signed but not effective until 2027-01-01. EU high-risk obligations were deferred by the 2026 Digital Omnibus from Aug 2026 to Dec 2027 (Annex III) and Aug 2028 (embedded systems) — verify the Official Journal citation before relying on the exact in-force date. Export controls are excluded from the count: they bind chip flows, not developers, and reversed direction in Jan 2026 when H200/MI325X licensing to China reopened.
Fresh review and fresh data are not the same thing.
A source can be checked recently while its newest published observation remains old. This separates maintenance health from source lag.
Review all 10 evidence streams
-
stale
Autonomous task-completion time horizonreviewed 2026-07-24 · observation 2026-05 · baseline
Sources
METR Time Horizons ↗Current structured reading reviewed against the canonical source.
-
due
Frontier training computereviewed 2026-07-27 · observation 2025-08 · source lag
Sources
Epoch Training Runs ↗Epoch's published series still ends in August 2025; review is current, observation is not.
-
due
Largest known single training runreviewed 2026-07-24 · observation 2026-07 · source lag
Sources
Epoch Notable AI Models ↗Newer frontier models still lack public compute estimates.
-
current
Algorithmic efficiency (pretraining)reviewed 2026-07-24 · observation 2024-03 · source lag
Sources
Epoch algorithmic progress ↗No formal measurement has superseded the March 2024 estimate.
-
stale
AI R&D automationreviewed 2026-07-24 · observation 2026-07 · baseline
Sources
METR Time Horizons ↗METR R&D evaluations ↗Eval and disclosure evidence reviewed; measurement remains low confidence.
-
due
Hyperscaler capexreviewed 2026-07-24 · observation 2026-Q1 · baseline
Sources
-
due
Frontier cluster power (announced vs energized)reviewed 2026-07-24 · observation 2026-07 · baseline
Sources
Epoch AI Data Centers ↗Energized capacity kept separate from announced capacity.
-
stale
Global AI compute stockreviewed 2026-07-24 · observation 2026-01 · source lag
Sources
Epoch AI Chip Sales ↗January hard anchor retained; later figure remains an extrapolation.
-
due
Frontier lab revenue run-ratereviewed 2026-07-27 · observation 2026-05 · baseline
Sources
Epoch AI Companies ↗Latest reported run-rate figures reviewed.
-
stale
Binding compute-threshold rules in forcereviewed 2026-07-27 · observation 2026-07 · baseline
Sources